Collision Course by Tracy Swartz.
Tags: LFT, Lakefront Trail, safety
Permalink Reply by Justin B Newman on July 26, 2012 at 1:17pm LSD daily traffic count: ~ 200,000?
Congress Parkway Bridge daily traffic count: 150,000
LFT: 70,000
That's really pretty impressive for what is (flyover excepted) a relatively inexpensively maintained piece of infrastructure.
-jbn
Permalink Reply by Mike Zumwalt on July 26, 2012 at 1:50pm
Permalink Reply by Mike Zumwalt on July 26, 2012 at 3:46pm
Permalink Reply by Bob A. on July 27, 2012 at 12:00am Mike, here in my mind are massive stretches of the trail that need to be repaved:
From the Oak Street curve south to Monroe
About 2 miles of the trail adjacent to and running a little north and south of McCormick Place
From about 41st street and onward south
The most beautiful part of the trail is actually the part by 31st Street Beach and the brand new 31st Street Boat Harbor. That small section of the trail was completely redone in concert with the recently completed boat harbor project.
Mike Zumwalt said:
I'm assuming from 31st street South nothing happens?
Permalink Reply by Anne Alt on July 27, 2012 at 5:53am Less traffic, fewer collisions.
Mike Zumwalt said:
I'm assuming from 31st street South nothing happens?
Permalink Reply by James BlackHeron on July 27, 2012 at 7:13am
© 2008-2013 The Chainlink Community, L.L.C. Julie Hochstadter, Director
Powered by